Cascade productinfo

Modular customized system for any boiler room

The incorporated cascade regulator makes the Ambassador+ the ideal boiler for cascade systems up to twelve boilers. Simple looping and straight-forward connections make the installation easy. With the supplied cascade rack, a capacity of more than two megawatts can be installed in the most inaccessible areas. The system is equipped with adjustable legs and does not have to be anchored to the wall.

Features cascade
✓ Complete cascade set including assembly manual
✓ Water-side supply and return pipe
✓ Open distributor
✓ Gas-side distributor
✓ Open distributor sensor
✓ Connection set for the individual boilers
✓ Flue-gas drainage material (stainless steel roof outlet, adhesive plate, 1.5 metres extension pipe and 2 bends of 45º)

Popular specifications

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
Dimensions (h x w x d) mm 842 x 476 x 486 898 x 476 x 677
Weight empty kg 46 73 78 83 92 101
Parallel flue-gas/air connection mm 80-80 80-80 100-100 100-100 130-130 130-130
Load (bottom value) kW 12,5 – 55,6 14,6 – 74,3 17,2 – 92,2 26,0 – 111 34,0 – 138 45,0 – 166
Capacity 80/60°C kW 12,0 – 53,5 14,0 – 71,2 16,5 – 88,4 24,7 – 106 32,6 – 132 43,3 – 160
Efficiency 40/30°C DIN 4702-8 % up to 110.6 % within the Ambassador+ range
Available flue-gas/air duct resistance* Pa 200
*Maximum allowed external joint resistance flue-gas and air duct on full load

 

General

Device type: A+
60
A+
80
A+
100
A+
120
A+
150
A+ 1
80
Dn
Dimensions (h x w x d)
mm 842 x 476 x 486 898 x 476 x 677
Water volume liter 3,9 5,0 6,5 8,3 10,4 12,9
Weight empty kg 46 73 78 83 92 101
Flow/return connection boiler inch R 1″ R 1″ R 1″ R 1″ R 1¼” R 1¼”
Flow/return connection after T-piece inch Rp 1¼” Rp1¼” Rp 1¼” Rp 1¼” Rp 1½” Rp 1½”
Connection size gas inch R ¾” R ¾” R ¾” R ¾” R 1″ R 1″
Concentrated flue-gas/air connection mm 80/
125
80/
125
100/
150
100/
150
100/
150
100/
150
Parallel flue-gas/air connection mm 80-80 80-80 100-100 100-100 130-130 130-130

 

Capacity

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
Load (bottom value) kW 12,5 – 55,6 14,6 – 74,3 17,2 – 92,2 26,0 – 111 34,0 – 138 45,0 – 166
Load (bw) (G20, G25) kW 13,9 – 61,8 16,2 – 82,5 19,1 – 102 28,9 – 123 37,8 – 153 50,0 – 184
Load (bw) (G31) kW 13,6 – 60,4 15,9 – 80,8 18,7 – 100 28,3 – 121 37,0 – 150 48,9 – 180
Load (bw) (G30) kW 13,5 – 60,3 15,8 – 80,2 18,6 – 99,7 34,7 – 120 36,8 – 150 48,8 – 180
Capacity 80/60°C kW 12,0 – 53,5 14,0 – 71,2 16,5 – 88,4 24,7 – 106 32,6 – 132 43,3 – 160
Capacity 50/30°C kW 12,9 – 57,4 15,2 – 77,5 18,0 – 96,2 27,2 – 116 35,5 – 144 47,3 – 175
Capacity 37/30°C kW 13,5 – 59,8 15,7 – 80,1 18,6 – 99,5 28,1 – 120 36,7 – 149 48,5 – 179
Efficiency 40/30°C DIN 4702-8 % up to 110,6 % within the Ambassador+ range

 

Gas consumption

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
Natural gas G25 m³st/u 1,54 – 6,84 1,80 – 9,14 2,12 – 11,4 3,20 – 13,7 4,18 – 17,0 5,54 – 20,4
Natural gas G20 m³st/u 1,32 – 5,88 1,54 – 7,86 1,82 – 9,76 2,75 – 11,8 3,60 – 14,6 4,76 – 17,6
Propane G31* m³st/u 0,51 – 2,27 0,60 – 3,04 0,70 – 3,77 1,06 – 4,54 1,39 – 5,65 1,84 – 6,79
Butane (B/P) G30* m³st/u 0,39 – 1,72 0,45 – 2,29 0,53 – 2,85 0,99 – 3,44 1,05 – 4,28 1,40 – 5,15
Gas connection pressure
nom. (min. – max.)
G25 mbar 25 (20 – 30)
G20 mbar 20 (17 – 25)
G31* mbar 30 (25 – 35) / 37 (25-45)
G30* mbar 50 (43 – 57)
*With the use of propane or butane/propane mixture (B/P) the ventilator speed must be reduced (parameter P4BD)

 

Emission

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
CO2 flue-gas* G25/G20 % 8,7 – 9,0 8,7 – 9,0 8,7 – 9,0 8,7 – 9,0 8,7 – 9,0 8,7 – 9,0
G31 % 9,3 – 10,3 9,3 – 10,3 9,3 – 10,3 9,3 – 10,3 9,3 – 10,4 9,3 – 10,5
G30 (B/P) % 9,3 – 10,4 9,3 – 10,4 9,3 – 10,4 9,3 – 10,4 9,3 – 10,5 9,3 – 10,6
Noise capacity level
(EN 15036-1:2006)
65 67 65 62 66 69
NOx-classification [EN483 / EN15420] 6
Flue-gas temperature at
combustion air temperature = 20°C
°C ~ 85-95
Max. flue-gas volume g/s 28,9 38,6 47,9 57,7 71,7 86,2
Available flue-gas/air duct resistance** Pa 200
*CO2 of the device measured/set without installed front panel
** Maximum allowed external joint resistance flue-gas and air duct on full load

 

Installation

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
Available resistance of
the installation at
ΔT = 20 K mWK 3,8 1,3 1,5 1,0 0,7 0,1
ΔT = 25 K mWK 5,1 3,7 3,7 3,0 3,2 2,5
Water pressure boiler min-max bar 1,0 – 4,0 5
Max. flow temperature °C 90
*With a water pressure switch instead of the standard incorporated water pressure sensor the boiler pressure can be 6.0 bar

 

Electric

Device type: A+ 60 A+ 80 A+ 100 A+ 120 A+ 150 A+ 180
Max. included electrical power W 240 265 270 280 505 520
Supply V/Hz 230/50
IP classification IPX4D

 

Other

CE product ID number CE 0063 BP3254
Gas category II2L3B/P
Device category B23, B23P; C13X, C23X, C33X, C43X, C53X, C63X, C83X

Apartments Groningen, NL

Hot water: 2 pieces of CD 100 combined with 2 pieces of 300 liter storage tanks
Central heating: 3 pieces of Ambassador+ 180 and 1 piece of Ambassador+ 150

Posted in projects ambassador+, living | Comments Off on Apartments Groningen, NL

Health Sciences in Groningen, NL

Central Heating: 4 pieces of SB+ 120
Hot water: 2 pieces of CD+ 100 combined with a 750 liter storage tank

Posted in projects ambassador+ | Comments Off on Health Sciences in Groningen, NL

Police Academy in Zwolle, NL

Central heating: 2 pieces of Ambassador+ 80
Hot water: 1 CD 120 combined with a 300 liter storage tank

Posted in government, projects ambassador+ | Comments Off on Police Academy in Zwolle, NL

Marianum college in Groenlo, NL

Central heating: 2 pieces of Ambassador+ 150 with 2 pieces Ambassador+ 180
Hot water:: Consul 55-230

Posted in education, projects ambassador+ | Comments Off on Marianum college in Groenlo, NL

Biesdel care facility in Velp, NL

Hot water: 2 pieces of CD+ 80 combined with a 450 liter storage tank
Central heating: 3 pieces of Ambassador+ 180 cascaded

Posted in projects ambassador+, care | Comments Off on Biesdel care facility in Velp, NL

Huuskes in Enschede, NL

Central heating: 8 pieces of Ambassador+ 180 cascaded

Posted in companies, projects ambassador+ | Comments Off on Huuskes in Enschede, NL

Ariënhuis care facility in Glanerbrug, NL

Central Heating: 3 pieces of Ambassador+ 100
Hot water: 1 CD 120

Posted in projects ambassador+, care | Comments Off on Ariënhuis care facility in Glanerbrug, NL

Music Centre in Enschede, NL

Central heating: 7 pieces of Ambassador+ 180

Posted in culture, projects ambassador+ | Comments Off on Music Centre in Enschede, NL

Apartments in Enschede, NL

Posted in projects ambassador+, living | Comments Off on Apartments in Enschede, NL

De Teuge in Zutphen, NL

Central heating: Cascade of 6 Ambassador+ 180 boilers

Posted in projects ambassador+ | Comments Off on De Teuge in Zutphen, NL